509 Charles Ln, Lombard, IL Mon to Fri from 7am, Sat 8am to 3pm
A+ BBB Accredited★★★★★ 5.0 on Google (708) 351-8182
Home / Service Areas / Elmhurst

Remodeling Contractor in Elmhurst, IL

Kitchens, bathrooms and basements for Elmhurst homes. We plan around the city's permit rules and its sewer program from day one.

Finished basement family room

Elmhurst, IL

From Cottage Hill to the Postwar Ranch

Elmhurst started out as Cottage Hill and took its new name in 1869. Near downtown, along York Street and Cottage Hill Avenue, homes from the 1870s stand next to ranches and split levels from after World War II.

That mix means no two Elmhurst remodels look alike. A kitchen in an old house near downtown and a basement in a 1950s ranch need different plans.

We plan both with care and handle the city permit paperwork for you.

  • Kitchen remodels in old and newer homes
  • Bathroom remodels
  • Basement finishing
  • Overhead sewer work planned before the drywall

Basements in Elmhurst

Protect the Basement Before You Finish It

When Elmhurst's sanitary sewers overload in heavy rain, basements on gravity sewers can back up.

Overhead Sewers

An overhead sewer sends basement drains up and out at mid wall height, which can protect your basement from sewer backups.

City Cost Share

Elmhurst pays 50% of eligible overhead sewer costs, up to $5,000. Rebuilding walls and finishes is not covered, so do this before you finish the basement.

Salt Creek and the Quarry

The Elmhurst Quarry, about half a mile west of downtown, takes in Salt Creek floodwater through a tunnel during big storms.

Our Work in Elmhurst

Remodeling for Every Era of Home

Kitchens, bathrooms and basements, all handled by one family crew.

01Kitchen backsplash tile

Kitchen Remodeling

New cabinets, stone counters and better layouts, whether the house is from 1880 or 1960.

See Kitchen Remodeling
02Bathroom vanity remodel

Bathroom Remodeling

Walk-in showers and new vanities, with old pipes and wiring brought up to date.

See Bathroom Remodeling
03Basement with stone fireplace

Basement Remodeling

Finished family rooms and baths, built after the sewer and drain tile side is sorted.

See Basement Remodeling
Big Brand Experience
Trusted By America's Leading Home Improvement Brands
The Home Depot
2004 to 2013
Lowe's
2013 to Present
25+
Years in Business

Permits in Elmhurst

Minor or Major: How Elmhurst Sorts a Remodel

The city's Community Development department sorts interior remodels into two kinds. A minor remodel is a bathroom, kitchen or basement that does not move plumbing, wiring, gas or sewer lines or change framing. It needs simple plans and a scope of work.

A major remodel needs stamped architectural plans, plus plumbing and electrical plans. We tell you which kind your project is at the estimate and handle the paperwork either way.

Our home base is Lombard, a few minutes west. See the full list of towns we serve.

How It Works

Your Remodel In Four Simple Steps

No confusing process and no runaround. Here is what working with our team looks like.

1

Free Estimate

We visit your home, listen to your ideas, take measurements, and answer every question.

2

Design & Quote

We help you pick finishes and hand you a clear written quote with a firm timeline.

3

We Build It

Our crew gets to work, cleans up every day, and fills you in the whole way.

4

Final Walkthrough

We walk the finished space with you and do not call it done until you are happy.

Questions From Elmhurst

Answers Before You Call

Does Elmhurst help pay for an overhead sewer?

Yes. The city's Overhead Sewer Program pays 50% of eligible costs, up to $5,000. Your drain tile has to be disconnected from the sanitary sewer to qualify, and rebuilding walls is not covered.

Is my remodel minor or major in Elmhurst?

If it moves plumbing, wiring, gas or sewer lines, or changes framing, plan on major. Major remodels need stamped plans. We sort this out with you before anything is submitted.

Do you work all over Elmhurst?

Yes, from the older streets near downtown to the postwar neighborhoods farther out.

How long does a bathroom remodel take?

Most bathrooms take about two to three weeks from demo to done. Larger primary baths with custom tile can take a little longer. You get a firm timeline before we start.

Start Your Elmhurst Remodel

Tell us what you want to change. We will visit for a free in-home estimate and walk you through the plan.

(708) 351-8182